
据Nio Energy Engineer @加公司表示,5月27日,在北京,上海,江苏,江苏,Zhejiang和Guangdong的电池及县和县的联系到达之后,Nio Energy于5月28日正式到达了Tianjin的县,县和县的连接。 5月28日,Heping区的第一个电池交换站即将推出,标志着该县在天津的电池完成的100%,覆盖了该市16个行政区域。 Home noticed that Li Bin, founder, chairman and CEO of NIO, revealed in the live broadcast room in February that the construction of a battery swap network this year was still the top priority, and the battery swap network "County Connection" was completed in the first half of 2025. As time hit, Nio built 3335Battery swap stations, including 988 highway battery swap stations. 【来源:这在家】